Showing posts with label bathroom. Show all posts
Showing posts with label bathroom. Show all posts

Wednesday, July 15, 2009

More pics of Bathroom 2


The new wall added to fit the tub in


Tub area with hopscotch design and glass tile


Looking in from the laundry room, window goes to backyard



Looking in from our bedroom, thats where the mirrors, double granite sink and nice light fixtures will be.

NEXT (friday): tape ceiling and laundry room, caulk moulding, paint ceiling and moulding
SATURDAY: do floor tile
SUNDAY: our anniversary but not sure if we'll do anything or work on the house. We'll see.....

Friday, July 10, 2009

Bathroom 2, In progress cont.



A quick picture even though he's done a lot more than this. The walls are actually DONE! all we need is the floor, cabinet, granite top, wall lighting, and shower doors.

Tuesday, June 30, 2009

Good Progress on Bathroom2






Naty just stopped working on the bathroom cause he was working overtime and we had parties to go to but this weekend he said NO MORE PARTIES and got to work cause we never know when the baby is coming. Him and his dad did a lot and are almost done! I can't believe it!

Tuesday, May 12, 2009

Bathroom 2, In progress





Bathroom 2 is completely destroyed! Now, the question is...when will it be done?! Naty wants it done before the baby comes so he has 12ish weeks to reach his goal but I want it done faster than that so here's the breakdown...

(X) Weekend of 4/25: move wall in laund/Bath to make bathroom bigger, destroy laund room and replace drywall.
(X) Weekend of 5/2: new copper pipes under the house, run new cold/hot pipes to laundry room, make hole in wall outside for new dryer location.
(X) Weekend of 5/9: completely destroy Bathroom
Weekend of 5/16: repiping for shower, moving sewer drain (or whatever its called) to a new location (toilet is moving)
Weekend of 5/23: NOTHING, my graduation on Saturday and nieces baptism on Sunday, but maybe on memorial day he'll put new lighting and new roof, install tub, and rock on walls to support tile
Weekend of 5/30: tile going up! tile tile more tile, walls and floor
Weekend of 6/6: painting last minute things like ceiling and moulding, put up new lighting over sinks, mirrors, install double sink and toilet
Weekend of 6/13: shower doors, cabinets and last minute things, should be done!

So we're on week 4 of 8

From there we have to finish the laundry room. Which will be installing cabinets, lights, moulding and finishing drywall.

Friday, May 01, 2009

Our Finished Bathroom


I never got around to uploading pictures of our finished bathroom so here it goes:




We finally have a finished and functioning bathroom! You don't know what that feels like. We only had 1 bathroom for about a year and now he decided to break down the other bathroom so we're gonna be going back to 1 bathroom soon, LOL. I told him this time it better not take that long! We have our wall and glass tile picked out but still have to look for our shower tile which we'll probably do sunday. But so far so good on the designing! its really fun!

Monday, February 09, 2009

Bathroom 1 is almost done!

Here's how it started:


During:


During:

Latest Pics:





yayy! we're supposed to go get the shower doors, sink and toilet today and finish the moulding this weekend. We buy the crown moulding at the swap meet so the man isn't there till sunday so we have to wait... anyway! I'm so proud of what it has turned into!